Format/length: | an6 (including decimal point and 2 decimal places) |
HES item: | |
National codes | |
Default codes |
Notes:
The calculation of the difference between POSITION CONTRACTED FTE and POSITION BUDGETED FTE, it is calculated as follows:
POSITION CONTRACTED FTE - POSITION BUDGETED FTE |
The calculated value for POSITION FTE VARIANCE may be negative.
This data element is also known by these names:
Context | Alias |
---|---|
plural | POSITION FTE VARIANCES |